Content

Programmed road and pavement works

Each year, a number of Barnet's roads and pavements are selected for repair based on their condition. 

Start dates are usually confirmed around 2 weeks before works begin. Residents and businesses in nearby areas will be notified by letter once a start date is confirmed. If schemes are delayed due to weather or other circumstances, we will write to residents and businesses and ensure further updates are provided.

You can find more information on the types of treatment works on the Pavement and road repair treatment types page

The work programme is developed in collaboration with our term maintenance contractor Tarmac Kier Joint Venture (TKJV), and our resilience contractors Marlborough Highways and O'Hara Bros Surfacing.

2025/2026 work programme - updated weekly

Road name and ward Details of work Status
Alexandra Road, Hendon Road resurfacing Awaiting scheduling
Approach Road, East Barnet Road resurfacing Awaiting scheduling
Baring Road, East Barnet Road resurfacing Awaiting scheduling
Barnet Hill, Barnet Vale/Underhill Road resurfacing Awaiting scheduling
Bohun Grove, East Barnet Pavement patching Awaiting scheduling
Bridge Lane, Golders Green Road resurfacing Awaiting scheduling
Brockley Hill, Edgware Road patching Awaiting scheduling
Brookhill Road, East Barnet Road resurfacing Awaiting scheduling
Chase Way, Brunswick Park Pavement patching Awaiting scheduling
Church Road, Hendon Road resurfacing Awaiting scheduling
Church Road, Hendon Pavement patching Awaiting scheduling
Church Road, Hendon Pavement patching Awaiting scheduling
Church Terrace, Hendon Road resurfacing Awaiting scheduling
Colindeep Lane, Colindale South Road patching Awaiting scheduling
Colney Hatch Lane, Friern Barnet Road resurfacing Awaiting scheduling
Colney Hatch Lane, Friern Barnet Pavement resurfacing Awaiting scheduling
Colney Hatch Lane, Friern Barnet Pavement patching Awaiting scheduling
Colney Hatch Lane, Friern Barnet Pavement patching Awaiting scheduling
Cool Oak Lane, West Hendon Pavement patching Awaiting scheduling
Deans Lane, Edgware Road patching Awaiting scheduling
Deans Lane, Edgware Pavement patching Awaiting scheduling
East Barnet Road, East Barnet Road resurfacing Awaiting scheduling
East Barnet Road, East Barnet Road resurfacing Awaiting scheduling
East End Road, Finchley Church End Road resurfacing Awaiting scheduling
Edgeworth Road, East Barnet Road resurfacing Awaiting scheduling
Edgware Road Slip Road, Cricklewood Road patching Awaiting scheduling
Edgware Road Slip Road, Cricklewood Pavement patching Awaiting scheduling
Edgwarebury Lane, Edgware Pavement patching Awaiting scheduling
Ellesmere Avenue, Edgwarebury Road patching Awaiting scheduling
Elm Close, Hendon Pavement patching Awaiting scheduling
Fernhurst Gardens, Edgware Pavement resurfacing Awaiting scheduling
Finchley Road, Golders Green Pavement resurfacing Awaiting scheduling
Friern Barnet Lane, Whetstone Road resurfacing Awaiting scheduling
Friern Barnet Road, Brunswick Park Road patching Awaiting scheduling
Friern Watch Avenue, Woodhouse Pavement patching Awaiting scheduling
Garden City/ Manns Road, Edgware Pavement patching Awaiting scheduling
Golders Green Road, Childs Hill Pavement patching Awaiting scheduling
Goldsmith Avenue, West Hendon Pavement resurfacing Awaiting scheduling
Gravel Hill, Finchley Church End Pavement patching Awaiting scheduling
Greyhound Hill, Hendon Pavement patching Awaiting scheduling
Greyhound Hill, Hendon Pavement patching Awaiting scheduling
Grove Road, East Barnet Road resurfacing Awaiting scheduling
Hale Lane, Edgware Road patching Awaiting scheduling
Hammers Lane, Mill Hill Road resurfacing Awaiting scheduling
Hermitage Lane, Childs Hill Road resurfacing Awaiting scheduling
High Road, West Finchley/Woodhouse Road resurfacing Awaiting scheduling
High Road, Whetstone Road resurfacing Awaiting scheduling
High Road, Woodhouse Road resurfacing Awaiting scheduling
Highfield Avenue, Golders Green Road resurfacing Awaiting scheduling
Holcombe Hill, Mill Hill Pavement patching Awaiting scheduling
Holders Hill Road, Finchley Church End Pavement patching Awaiting scheduling
Hutton Grove, West Finchley Road patching Awaiting scheduling
Lanacre Avenue, Colindale North Road resurfacing Awaiting scheduling
Leslie Road, East Finchley Road patching Awaiting scheduling
Lodge Lane, West Finchley Pavement patching Awaiting scheduling
Meadway, Garden Suburb Pavement patching Awaiting scheduling
Midholm Close, Garden Suburb Road patching Awaiting scheduling
Millway, Mill Hill Road resurfacing Awaiting scheduling
Milton Road, West Hendon Pavement patching Awaiting scheduling
Norrice Lea, Garden Suburb Road patching Awaiting scheduling
Oakleigh Road North, Whetstone Road patching Awaiting scheduling
Orange Hill Road, Burnt Oak Pavement patching Awaiting scheduling
Osidge Lane, Brunswick Park Pavement patching Awaiting scheduling
Priestley Way, West Hendon Pavement patching Awaiting scheduling
Prince Of Wales Close, Hendon Road resurfacing Awaiting scheduling
Purley Avenue, Childs Hill Pavement patching Awaiting scheduling
Queens Road, Hendon Road resurfacing Awaiting scheduling
Simmons Way, Whetstone Pavement resurfacing Awaiting scheduling
Somercoates Close, East Barnet Pavement patching Awaiting scheduling
Somerton Road, Childs Hill Pavement patching Awaiting scheduling
St Davids Place, West Hendon Pavement patching Awaiting scheduling
St Margarets Avenue, Whetstone Road resurfacing Awaiting scheduling
Stanhope Road, Woodhouse Pavement patching Awaiting scheduling
Station Road, West Hendon Road resurfacing Awaiting scheduling
Sturgess Avenue, West Hendon Road resurfacing Awaiting scheduling
The Drive, Edgware Pavement patching Awaiting scheduling
The Hyde, Colindale South Pavement patching Awaiting scheduling
The Ridgeway, Childs Hill Pavement patching Awaiting scheduling
The Ridgeway, Mill Hill Pavement patching Awaiting scheduling
The Riding, Childs Hill Pavement patching Awaiting scheduling
The Vale, Childs Hill Pavement resurfacing Awaiting scheduling
The Vale, Childs Hill Pavement patching Awaiting scheduling
Vivian Avenue, West Hendon Road resurfacing Awaiting scheduling
Warwick Road, Barnet Vale Road resurfacing Awaiting scheduling
Water Brook Lane, Hendon Pavement patching Awaiting scheduling
Wellhouse Lane, High Barnet/Underhill Road resurfacing Awaiting scheduling
Wellhouse Lane, High Barnet/Underhill Road resurfacing Awaiting scheduling
Westbury Road, Totteridge & Woodside/West Finchley Road resurfacing Awaiting scheduling
Western Parade, Barnet Vale Pavement patching Awaiting scheduling
Wolsey Grove, Burnt Oak Pavement patching Awaiting scheduling
Wolsey Grove, Burnt Oak Pavement patching Awaiting scheduling
Wood Street, High Barnet Pavement patching Awaiting scheduling
Woodfield Avenue, Colindale South Pavement patching Awaiting scheduling
York Road, Barnet Vale Road resurfacing Awaiting scheduling

 

2024/2025 work programme - updated weekly

Road name and postcode Details of work Status
Abbots Road, HA8  Pavement resurfacing - Cardinal Close to Orange Hill Road (L) Completed
Alston Road, EN5 Pavement patching - From Side of no.2 Falkland Rd to Entrance to Alston Court / L Completed
Alverstone Avenue, EN4  Road resurfacing - From O/S no.7 to O/S no. 10a Completed
Amber Grove, NW2 Road patching - From Prayle Grove to End Completed
Ashburnham Close, N2  Pavement resurfacing - Stanley Road to End (B) Completed
Ballards Lane, N12  Pavement patching - From o/s no.382 to opposite no. 751 High Road (R)  Completed
Baring Road, EN4 Pavement patching - From O/s No. 9 Baring Road to O/s no.7 Baring Road / R Completed
Barnet Gate Lane, EN5  Road resurfacing - From Barnet Road to May's Lane Completed
Barnet Road, EN5 Pavement patching - From Kerri Close junction to Pine Lodge Driveway / L Completed
Barnet Road, EN5 Road patching - From 30MPH before B552, Hendon Wood Lane to 110m past Kerri Close Completed
Barnet Road, EN5 Road patching - From start of Splitter Island to 30MPH before B552, Hendon Wood Lane Completed
Barnet Road, EN5  Road resurfacing - From 100M East of Kerri Close to end of splitter island, Wood Street Completed
Bellevue Road, N12 Road patching - Friern Barnet Road to The Crescent Completed
Broadhurst Avenue, HA8 Road patching - Broadfields Avenue to O/S 40 Completed
Brockley Hill, HA7 Road resurfacing - Bridge repairs Completed
Brunswick Park Road, N11 Road resurfacing - From Osidge lane (incl. roundabout) to Russell Lane  Completed
Burnt Oak Broadway, HA8 Pavement patching - Montrose Avenue to Bridge (L) Completed
Burnt Oak Broadway, HA8 Pavement patching - From O/S No 47 Burnt Oak Broadway to Stag Lane / L Completed
Burnt Oak Broadway, HA8  Road patching - From Deansbrook Road to Southbourne Avenue Awaiting scheduling
Church Hill Road, EN4 Road patching - Parkside Gardens to Stuart Road Completed
Claremont Road, EN4 Road resurfacing - Junction with Clitterhouse Rd to OS School House (inc roundabout) Completed
Claremont Road, NW2 Pavement patching - From Opposite Caney Mews bus stop F (on Claremont Rd) to Opposite Junction with Caney Mews / R Completed
Claremont Road, NW2 Pavement patching - From Opposite bundary of no. 22/23 to Opposite no.26 / L Completed
Colindale Avenue, NW9 Pavement patching - From Opposite Bus Stop CB (Colindale Station) to Lamp Column 23 (approximately) / L Awaiting scheduling
Colindeep Lane, NW9 Road resurfacing - Industial estate to dule carridgeway  Completed
Colindeep Lane, NW9 Road resurfacing - outside 95 to  Completed
Coppetts Road, N10 Road resurfacing - Left and right hand of side splitter Completed
Dale Grove, N12  Road patching - Dale Grove to Birkbeck Road, access to No.1 Dale Grove Completed
Daws Lane, NW7  Road resurfacing - From Byron Road to Watford Way Completed
Deans Lane, HA8  Pavement resurfacing - From Grange Hill To Hale Close (L) / From West Way To Laneside (L) / From Hale Drive To Rudyard Grove (R)  Completed
Deansway, N2 Pavement patching - From O/s No 24 Deansway to O/s No 26 Deansway / L Completed
Deansway, N2 Road patching - From O/S No 5 to O/S No 19 Completed
Deansway, N2  Road patching - From O/S No 2 to No 8 Completed
Dollis Road, N3 Road patching - O/S 15 to Nether Street Completed
Eagans Close, N2  Pavement resurfacing - Market Place to End (B) Completed
East End Road, N2 Pavement patching - From 7m south of Entrance to Ethan Drive to Start of Bus Bay near Buckland House / L Completed
East End Road, N3 Pavement patching - From O/s No. 94 East End Road to O/s No. 114 East End Road / R Completed
Eastville Avenue, NW11  Pavement resurfacing - Leeside Crescent to Grosvenor Gardens (R)  Completed
Edgware Road Flyover, NW2 Road patching - Opposite Priestley Way Completed
Edgware Road Flyover, NW2  Road patching - Patch opposite Staples Corner Business Park Completed
Edgware Road Flyover, NW9 Road patching - Outside 100 W Hendon Broadway and on flyover Completed
Edgware Road Flyover, NW9  Road patching - Opposite Brent Park Road to opposite Woolmead Avenue Completed
Edgware Road, NW2 Road patching - End of splitter to Gratton Terrace (Cricklewood Broadway) Awaiting scheduling
Edgware Road, NW2  Pavement patching - Opposite entrance to Shell Garage (no.383) to Pedestrian Guardrail by Geron Way (R) Completed
Edgware Road, NW2  Pavement resurfacing - Geron Way to Opposite Humber Road (R) Completed
Esmar Crescent, NW9  Road resurfacing - From Cool Oak Lane to end of road Completed
Fairlawn Avenue, N2  Pavement resurfacing - High Road to Corner (B) Scheduled to start: 24 February 2025
Fairmead Crescent, HA8 Road resurfacing - Kenilworth Road Parnell Close Completed
Finchley Lane, NW4 Pavement patching - From Opposite no.34 Finchley Ln to O/s no.47 Finchley Ln / L Completed
Finchley Lane, NW4 Road patching - Linfield Close to A1(T) Great North Way Awaiting scheduling
Finchley Road, NW11 Pavement patching - From Alberon Gardens to Addison Way / R Completed
Finchley Road, NW11 Road patching - Cricklewood Lane to Rodborough Road Completed
Finchley Road, NW11 Road patching - Rodborough Road to North End Road (A502) Completed
Fitzjohn Avenue, EN5  Road resurfacing - From Side of Red Lion Pub to Mays Lane Completed
Friern Barnet Lane, N20  Road resurfacing - From Friary Road to Windsor Court Completed
Friern Barnet Road, N11  Road resurfacing - From Ramsden Road to Carlton Road Completed
Frith Court, NW7 Road patching - From B1462 to Abercorn Road Completed
Garratt Road, HA8 Pavement patching - From O/S No 13 Garratt Road to No 5 (Church Boundary) / R Completed
Gervase Road, HA8  Pavement patching - From Side of no.1 Thirleby Rd to O/s no.13 Gervase Road / R Completed
Glebe Crescent, NW4 Pavement patching - From O/s no.12 Glebe Crescent to O/s no.24/26 Glebe Crescent / L Completed
Gloucester Grove, HA8 Pavement patching - From Montrose Avenue to O/s no.8 Gloucester Grove / R Completed
Grahame Park Way, NW9  Pavement resurfacing - Pedestrian Crossing Point (Opposite Field Mead) to LP39 (L) Completed
Great North Road, EN5  Road resurfacing - From Cherry Hill to Walfield Avenue (Phase 2) Completed
Great North Road, EN5  Road resurfacing - From Joint o/s no. 3 (Borough Boundary) to Beaumont Place Completed
Great North Road, EN5  Road resurfacing - From Station Road to Cherry Hill (Phase 1) Completed
Gresham Avenue, N11  Pavement resurfacing - Bethune Play Area FW junction to Corner of Sports Facility (L) Completed
Hadley Green, EN5  Road resurfacing - From Christ Church Lane to Dury Road Completed
Hale Grove Gardens, NW7  Pavement resurfacing - Hale Grove Garden Footpath (from Hale Grove to railway bridge west face) & Lilley Lane (from Manor Drive to Hale Grove) Completed
Hale Lane, HA8  Pavement resurfacing - Upcroft Avenue to Stoneyfields Lane (L) Completed
Hammers Lane, NW7 Pavement patching - From Between LP20 and LP21/ O/s no.59 Hammers Lane to Approx LP22 / L Completed
Hampstead Gardens Road resurfacing - Finchley road to End (cul-de-sac) Completed
Hampstead Way, NW11  Pavement patching - From Side of 802/806 Finchley Rd (End of Cobbles) to O/S boundary of No 162/160 / L Completed
Hampstead Way, NW11  Pavement patching - From Finchley Road to End of Cobbles / L Completed
Hampstead Way, NW11  Pavement resurfacing - From Wellgarth Road to junction with Turner's Wood / L Completed
Hampstead Way, NW11  Road patching - From Wellgarth Road to Meadway Completed
Hartley Avenue, NW7  Pavement patching - From Millway Medical Centre western Car Park entrance/Hartley Av to O/S Dome House/Hartley Av / L Completed
Hayes Crescent, NW11 Pavement patching - From O/S Boundary of No 8/6 to O/s 2a Adla House / L Completed
Helenslea Avenue, NW11 Pavement patching - From O/s no.1a Helenslea Avenue to Boundary of No 5/7 Helenslea Avenue / L Completed
Hendon Lane, N3 Road resurfacing - from Rawlins close to 109 Hendon Lane Completed
Hendon Lane, NW4 Pavement patching - From Dollis Brook bridge (Hendon Lane) eastern end of Pedestrial Guardrail to Broughton Avenue / L Completed
High Road, N12  Road resurfacing - From A1003 Kingsway to Churchfield Avenue Completed
Highwood Hill, NW7  Road resurfacing - From A5109 Marsh Lane/Highwood Hill to Lawrence Street Completed
Hillary Rise, EN5 Road resurfacing - Kingsmead to end of road Completed
Hillside Gardens, EN5  Pavement patching - From O/s no.91 Hillside Gardens to O/s no.95/97 Hillside Gardens / L Completed
Hodford Road, NW11 Pavement patching - From Approx. corner by side of no.23 Golders Green Rd to Bus stop post GP (Approx) by side of no. 23 Golders Green Rd / R Completed
Holders Hill Road, NW7 Road patching - Thornfield Avenue to Holders Hill Circus roundabout Completed
Holne Chase, N2 Road patching - Winngton Road to Kingsley Way Completed
Hoop Lane, NW11 Pavement patching - From O/s no.25 Hoop Lane to O/s no.19 Hoop Lane / R Completed
Kings Drive, HA8 Road resurfacing - From Joint o/s no. 79 to Oakleigh Gardens Completed
Kings Road, EN5 Pavement patching - From O/s no.3/5 Kings Road to O/s no.9 Kings Road / L Completed
Kingsway, N12  Road resurfacing - From A1003 Woodhouse Road ro A598 Ballards Lane Completed
Lawerance Street, N12 Road resurfacing - The Reddings to Sunnyfields Completed
Lawrence Street, NW7 Pavement patching - From Opp. Victoria Road to Bus Bay opposite Holcombe Court / L Completed
Lawton Road, EN4  Pavement patching - Stonegrove park entrance to Mill Ridge (L) Completed
Layfield Crescent, NW4 Pavement patching - From Layfield Road junction to O/s driveway of No. 54 / L Completed
Lichfield Grove, N3  Pavement resurfacing - Glenhill Close to Boundary of No.2/4 (L) Completed
Lyonsdown Road, EN5  Road resurfacing - From Longmore Avenue to Richmond Road Completed
Marsh Lane, NW7  Road resurfacing - From A1(T) BARNET WAY to o/s no 51 Completed
Middleway, NW11 Road patching - From O/S No 34 to Thornton Way Completed
Milespit Hill, NW7 Pavement patching - From The Willows no.79 to O/S No 83 / L Completed
North End Road, NW11  Pavement resurfacing - The Park to Park Drive (L) Completed
North End Road, NW11  Pavement resurfacing - Hampstead Way to Cinderella Path (R) Scheduled to start: 7 February 2025
North End Road, NW11  Road resurfacing - From Wellgarth Road to West Heath Drive Completed
Northfield Road, EN4  Pavement patching - From No 80/82 to no. 86/88 Completed
Northway Crescent, NW7 Road patching - From A1 to End (Eastern arm between no. 615-619 and 613 Watford Way) Completed
Oak Avenue, N10  Pavement resurfacing - Sydney Road to Alexandra Road (B) Awaiting scheduling
Oakleigh Gardens, HA8 Road patching - From Green Lane to Oakleigh Gardens inc loop Completed
Oakleigh Road North, N20 Pavement patching - From Oakleigh Road North Railway Bridge (western grass verge) to Oakleigh Road North Railway Bridge (eastern grass verge) / L Completed
Oakleigh Road North, N20  Road resurfacing - From York Way to Ryall's Court access road (Phase 1) Completed
Oakleigh Road North, N20  Road resurfacing - From Ryall's Court to Brunswick Avenue (Phase 2) Completed
Orange Hill Road, HA8  Pavement resurfacing - Blessbury Road to Boston Road (L) Completed
Osidge Lane, N14  Road resurfacing - From Access Road between no.129/131 to Hampden Square Completed
Poplar Grove, N11 Road patching - From Colney Hatch Lane to End Completed
Quinta Drive, EN5 Pavement patching - From LP4 (approx) o/;s Whitings Hill Primary School's sport grounds to LP5 (approx) o/;s Whitings Hill Primary School's sport grounds / R Completed
Raleigh Drive, N20  Road resurfacing - From Oakleigh Road North to Manor Drive Completed
Ravensdale Avenue, N12 Road resurfacing - S/O 860 High Road to O/S 5 Completed
Regina Close, EN5  Pavement resurfacing - Queens Road to End (B) Completed
Silkstream Road, HA8  Pavement resurfacing - Montrose Avenue to Bridge (L) Completed
Southover, N12 Road resurfacing - Northiam to Chanctonbury Way Completed
Stapylton Road, EN5  Pavement resurfacing - Salisbury Road to Union Street (L) Completed
Station Approach, EN4 Road resurfacing - York Road to Station Road Completed
Station Road, NW4  Pavement resurfacing - From Algernon Road to Vaughan Avenue / B Completed
Stonegrove, HA8 Pavement patching - From Regents Court Entrance to Pedestrian Crossing / L Completed
Stonegrove, HA8  Pavement resurfacing - Stonegrove park entrance to Mill Ridge (L) Completed
Stonegrove, HA8  Road resurfacing - From Surface joint o/s no. 52 to Station Road Completed
Sutherland Close, EN5  Pavement resurfacing - Manor Road to End (B) Completed
Tapster Street, EN5 Road patching - Moon Lane to high Street Completed
Temple Fortune Lane, NW11 Road patching - Sheridan Walk to Finchley Road Completed
The Avenue, EN5 Pavement patching - From The Drive to O/s no.1-3 The White Lodge / R Completed
The Broadway, NW7  Pavement patching - O/s no.44 The Broadway to O/s no.50/52 The Broadway (R) Completed
The Broadway, NW7  Road resurfacing - From M1 bridge to Bunns Lane / Hale Lane Completed
The Hyde, NW9 Pavement patching - From Behind no.24 Southbourne Court (opposite side) to Behind no.4 Southbourne Court (opposite side) / L Completed
The Hyde, NW9 Road patching - End of splitter to start of splitter at Hyde estate lights Awaiting scheduling
The Hyde, NW9 Road patching - Kingsbury Road to start of splitter at lights at Hyde estate supermarket entrance Awaiting scheduling
The Hyde, NW9  Road resurfacing - From Southbourne Avenue to Asda Colindale Superstore Awaiting scheduling
The Hyde, NW9  Road resurfacing - From Colindeep Lane to Wakemans Hill Avenue Awaiting scheduling
The Ridgeway, NW7  Pavement resurfacing - From no.2a Rushden Gardens to Watch Tower House (200m north of 2a Rushden Gardens) Completed
The Ridgeway, NW7  Road resurfacing - From High Street to St Vincent Lane Completed
The Vale, NW11 Pavement patching - From O/S No. 107/105 to O/S No. 97/95 / L Completed
The Vale, NW11  Pavement resurfacing - Wayside to The Ridgeway (L) Completed
The Vale, NW2 Road patching - Dunstan Road to The Ridgeway Completed
Thirleby Road, HA8 Pavement patching - From Montrose Avenue to Opposite No 56 Thirleby Rd / R Completed
Thirleby Road, HA8 Road patching - Montrose Avenue to Gervase Road Completed
Totteridge Common, N20  Road resurfacing - From Hendon Wood Lane Jnct (west side) to Hendon Wood Lane Jnct (east side) Completed
Totteridge Village, N20  Road resurfacing - From The Close to O/s no. 18  Completed
Varley Parade, NW9  Road resurfacing - From A5 Edgware Rd to Woodfield Avenue Completed
Watling Avenue, HA8 Road patching - Eversfield Gardens to Cressigham Road Completed
West Hendon Broadway Slip 2, NW9  Road patching - From Brent Park Road to Staples Corner West Completed
West Hendon Broadway, NW9 Road patching - end of splitter to Ramsey Close Awaiting scheduling
Wilberforce, NW2 Road patching - Herbert Road to Station Road Completed
Willifield Way, NW11 Road resurfacing - From Asmuns Hill to Temple Fortune Hill Completed
Wood Street, EN5 Pavement patching - From Cattley Close to Boundary between Union St/ no.53 Wood St / R Completed
Wood Street, EN5  Road resurfacing - From CHURCH PASSAGE to A1000 HIGH STREET Completed
Woodside Avenue, N12 Road resurfacing - Woodside Grange Road to Woodside Park Road Completed
Woolmead Avenue, NW9 Road patching - From Cool Oak Lane to End Completed