Content

Freedom of Information Request

Barnet Local Plan - Policy GSS05 and Site Allocation 28

Received: 24 March 2025

Barnet Local Plan - Policy GSS05 and Site Allocation Please provide the following information:a) any background documents which lay behind the Site Selection Background Paper, and who was responsible for signing this off;b) any documentation from TfL confirming that Site 28 is available for high-density residential housing;c) any correspondence between LBB and TfL or London Underground Limited regarding the feasibility of development over the Underground Station and tracks;d) any evidence relied on by the Examining Inspectors to justify the finding that delivering the quantum of development proposed on Site Allocation 28 while also maintaining existing transport infrastructure and operations was feasible.

Outcome / Documents

  • 14372420 Extracted from TfL Sites 14 Locations forms and maps 1 Sept 2017 - application/pdf - Download
  • 14372420 Local Plan consultation on Edgware Town Centre - application/pdf - Download
  • 14372420 Members Advisory Group meetings and Briefings_Redacted - application/pdf - Download
  • 14372420 Save Our Edgware letter_Redacted - version uploaded on 23/04/2025 - application/pdf - Download
  • 14372420 Site Assessment Methodology 2018 - version uploaded on 23/04/2025 - application/pdf - Download
  • 14372420 Site Selection Background document Sign off dated 09.01.2020_Redacted - application/pdf - Download
  • 14372420 Spob minutes_Redacted - application/pdf - Download
  • 14372420 TfL Letter dated 06.09.2022_redacted - application/pdf - Download
  • 14372420 TfL Letter dated 09.08.2021_Redacted - application/pdf - Download
  • 14372420 Toolkit_part_4_local_plan_soundness_quality_assessment_nov2021 - application/pdf - Download
  • Response (some exempt) - version uploaded on 23/04/2025 - application/pdf - Download