Sanders Lane Bridge works

Background of the scheme

The bridge was initially constructed in1880 over the Edgware, Highgate and London Railway tracks which connected Mill Hill East to the former Edgware railway station. It linked Devonshire Road to Bittacy Hill and Mill Hill East station. Trains ran to Edgware from 1867 up until the station closed in 1964. 

Sanders Lane Bridge map

In 1993, Sanders Lane Bridge was closed to vehicle traffic, with only pedestrian access permitted across the bridge.

Due to the nature of the structural issue and the age of the bridge, we had to carry out large scale investigations and surveys to establish the best long-term solution.

It would have been unsafe for us to reopen the bridge whilst we undertook our investigations.

Crack under Sanders Lane Bridge

Project details

Sanders Lane Bridge has been closed since March 2023 after a structural defect was found that created an immediate safety risk.

Sanders Lane Bridge

Following our extensive investigations, a solution has been found which includes:

  • Demolishing the existing bridge
  • Building a new footpath at a lower level, within the natural landscaping of the area.

Prior to demolition works starting, we have several tasks to undertake including:

  • An ecological survey to assesses the environmental impact of the proposal
  • A bat survey to check for the presence of bats in the area
  • Liaising with utility companies (such as Cadent Gas and Thames Water) to ensure the diversion of their apparatus before work commences
  • Horticultural tidy up of the area within the work zone to enable the safe completion of works.

The works will be carried out in line with the ecological features of the site, and in conjunction with Barnet Greenspaces and Barnet trees departments. The removal of the vegetation will be kept to a minimum possible.

Programme of works

Sanders Lane Bridge visualisation
Phase Status
Pre-construction In progress
Demolition of bridge Scheduled to start mid-August 2025
Construction of new footpath Scheduled to start early-September 2025
Landscaping Scheduled to start late-September 2025
Lighting installation Scheduled to start early-October 2025

Work should be completed by mid-October 2025, although this is subject to weather and no issues arising during the demolition or construction phases

Whilst we appreciate some residents may wish to take photos or videos of the demolition and reconstruction, we would like to remind you not to enter the fenced off area. Temporary heras fencing has been erected around the work area for your safety.

Contact the Sanders Lane Bridge project team

If you have any questions you can contact the project team by email: highwayscorrespondence@barnet.gov.uk